Case

Participated in the design and construction of wires and cables for Beijing subway projects, Line 4, Line 6, Line 8, Line 10, Batong South Extension, Line 17, Line 19 Line, etc., to contribute to the Beijing subway project.

Participate in the design, production and supply of wires and cables for the Taiyuan subway project.